Titan Power is currently assisting Caliente Construction in the design, build and installation of an existing data center in Scottsdale, Arizona. Working with Caliente and the Maricopa Cumminity College District, Titan Power will be installing:

  • Three (3) Liebert 30 Ton CRAC’s
  • Four (4) 120kVA Powerware UPS’s
  • Eight (8) 100kVA Power Distribution Units (PDU)
  • Uninterruptible Power Supply (UPS) Paralleling Gear
  • Four (4) Battery Cabinets
  • Electrical and Mechanical Installation of the Data Center

Click the below link for pictures of the beginning stage of this project. http://www.facebook.com/search/?post_form_id=ce0b317b2bd9524e3f40a5379c0c94d3&q=titan+power&init=quick&ref=search_preload#!/album.php?aid=172966&id=163760628925&ref=mf

*Completion is in progress.