MCCCD Scottsdale Data Center Construction Project

Titan Power designed and built a new Data Center in Scottsdale, AZ. This Data Center included a Parallel 500kVA UPS Systems with A & B Power source, (8) 100kVA Liebert Power Distribution Units on the Data Center floor 
and (2) 30 Ton Liebert CRAC Units for sufficient cooling inside the Data Center. Titan Power also provided and installed power cabling under the floor, power strips and equipment racks for this new Data Center.