PROJECTS
University of Arizona Computer Center - Tucson, Arizona

Titan Power was contracted to install a Three Phase 500kVA Uninterruptible Power System to back up power of the University of Arizona Computer Center. This project included electrical upgrades and installation of the output power distribution for the entire facility. Titan Power delivered this project early, on budget and with zero defects.
Stanford University - Menlo Park, California
Titan Power was awarded the contract to supply and install an advanced server cooling solution for the Stanford University Linear Accelerator Center (SLAC).
The bid requirements were for a Liquid Cooling Package that was capable of eliminating up to 22 kW of heat load from adjoining server cabinets.
Titan Power won the bid by offering the LCP+ (Liquid Cooling Package Plus ) designed by Rittal corporation. Titan Power completed mechanical and electrical installation of ten (10) LCP+ units and eight sealed server enclosures as the backbone of the installation. The installation of this new technology allowed for neutral cooling of up to 30 kW heat load per individual server enclosure with an overall lower "total cost of ownership" than conventional cooling methods.
Arizona State Retirement System – Tucson, Arizona
Titan Power’s Arizona State Contract discount saved Arizona State Retirement over 30% on this project. Titan Power replaced three older single phase UPS systems with one Three Phase 20kVA uninterruptible Power System. This included providing power distribution equipment in the rack enclosures and providing a longer run time in the event of a power outage.
First Technology Capital – Gilbert, Arizona 
Titan Power installed an Emergency Power System for the facility that included a 1750kW Generator and two (2) 1600 Amp Automatic Transfer Switches. This project required electrical integration into the existing power distribution of the facility. Titan Power completed pre-planning efforts from initial design, engineering, documentation and permitting to ensure this project was completed on time, with no interruptions to existing tenants.
KVOA TV- Tucson, Arizona
Titan Power installed one 80kVA Uninterruptible Power System and one 30kVA Uninterruptible Power System. This project required rigging and extensive power distribution through out the facility. The project was performed successfully and completed on schedule.