Specialized Testing

Today’s companies rely more than ever on complex facility support systems to keep their critical loads operating. Down-time and the adverse affect on productivity and profitability is simply unacceptable.

Mission critical facilities are complex in design and dynamic by nature. Critical grade power and air equipment are individual units which collectively support, back-up and protect the primary mission of the organization. Much thought, design, energy, and capital has been invested in the functional processes and operational sequencing of this equipment to perform as one complete inter-dependant and integrated system.

Titan Power’s offers a wide range of specialized testing options, each designed for a specific purpose and performed under controlled conditions. Scheduled testing not only gives you peace of mind, but also allows you the flexibility to be proactive rather than reactive in your risk management practices.

 

Infrared Thermography

Infrared TestingInfrared Inspection

The purpose of Infrared Thermography is to identify, isolate and document abnormally warm or cool connectors, conductors, or components that may be a potential problem in electrical systems. Exceptions are normally caused by loose or deteriorated connections, short circuits, overloads, load imbalances, or faulty, mismatched, or improperly installed components.

Click here for more information.

Load Bank Testing

Resistive load banks are the most commonly used load banks for testing

generator sets and power systems.  They can provide full KW loading to the

power source to completely evaluate the engine cooling, exhaust and fuel systems. 

They will not load the generator to its full nameplate KVA capacity at 0.8 Power Factor. 

In order to load the generator to its full KVA rating, reactive load banks will be required.

 

UPS Acceptance Testing

The purpose of the test is to verify that the UPS system is performing to

manufacturer’s design specifications. The test is normally performed within

72 hours after equipment installation and successful start-up. However, this

test may be conducted at any point in the UPS design life to establish a

benchmark (snapshot) of performance.

 

Facility Roll-Over Testing

The purpose of the test is to confirm that all facility critical emergency back-up

systems perform correctly during a real-world power outage. Critical buss loads should not lose power at any point and all non-critical facility loads should re-establish within 7-10 seconds after loss of utility power. An integral part of the test is to ensure that all equipment performs a successful roll-back after re-establishing utility power.

 

Contact us for more information on the different types of testing.

 