header-data-center-design-build-sub

Arizona State University (Tempe campus)

This project with ASU included replacing a legacy UPS with a new three phase UPS model, with N+1 power modules for redundancy. The UPS was rigged into place, with four battery cabinets and maintenance bypass cabinets. Titan Power provided the electrical installation for the UPS to Battery Cabinets, and Load banked the UPS