State of Arizona DOA

Titan Power provided and installed 2 three phase UPS systems with 5 strings of VRLA batteries for the State of Arizona DOA. Due to the size of the elevator, each UPS was disassembled and separated onto 17 pallets. Each pallet was then taken to the basement separately, where theUPS was then reassembled and started up. The status panel for each system was removed.