Facility Roll-Over Testing
The purpose of the test is to confirm that all facility critical emergency back-up systems perform correctly during a real-world power outage. Critical buss loads should not lose power at any point and all non-critical facility loads should re-establish within 7-10 seconds after loss of utility power. An integral part of the test is to ensure that all equipment performs a successful roll-back after re-establishing utility power.