Titan Power’s Arizona State Contract discount saved over 30% on this project. Titan Power replaced three older single-phase Uninterruptible Power Supply (UPS) systems with one three-phase 20kVA UPS system. This upgrade included providing power distribution equipment within the rack enclosures and delivering extended run time in the event of a power outage.