Titan Power installed an emergency power system for the facility that included a 1750 kW generator and two (2) 1600 Amp automatic transfer switches. The project required seamless electrical integration into the facility’s existing power distribution system.
Titan Power managed all pre-planning efforts—from initial design, engineering, and documentation to permitting—to ensure the project was completed on time with no interruptions to existing tenants.