Titan Power was awarded a design/build contract for the building foundation, backup power and air infrastructure for an 8,000 square foot data center and adjacent “power room.” Included in Titan Power’s scope of work was to provide and install a 2600 amp automatic transfer switch (ATS), three (3) 800kW generators and paralleling switchgear, 1200 gallon fuel tank and fuel distribution with fuel polishing system, two (2) 15 ton water chilled computer room air conditioners (CRAC) and six (6) 30 ton water chilled CRAC units with water provided by three (3) 75 ton cooling towers. In addition, Titan Power provided and installed 1000kVA of Eaton/Power ware uninterruptible power supply (UPS) systems and power distribution systems to serve eighty-four (84) rack/enclosures and twenty-two (22) computer console positions.