Titan Power replaced the existing generator and UPS with all new upgraded equipment. A chemical fire suppression system was created and installed, and two Computer Room Air Conditioners with air-cooled outside condensers were also installed. Titan Power insulated the room, and replaced existing acoustic ceiling tile with vinyl rock to complete the job.

Service Locations
Expanded Service Area