Titan Power provided project management to Cliff Castle Casino located north of Phoenix to install and replace an emergency generator system. Titan Power installed three parallel 750kW generators, 2 new SES and 2 – 3000 Amp ATS. The system is intelligent and can determine the casino’s needs, and tailor the generator output to meet these needs. Titan Power Project Management Team provided a solution that reduced the project time line by two months and provided cost-savings to the casino.