Titan Power installed an Emergency Power System for the facility that included a 1750kW Generator and two (2) 1600 Amp Automatic Transfer Switches. This project required electrical integration into the existing power distribution of the facility. Titan Power completed pre-planning efforts from initial design, engineering, documentation and permitting to ensure this project was completed on time, with no interruptions to existing tenants.