Titan Power removed two (2) 22-ton CRAC units and their associated condensers, replacing them with two (2) new 25-ton Stulz CRAC units. The project included rigging the condensers onto the mezzanine and positioning the new units. To minimize downtime for the data center, the work was completed in two (2) separate phases.